
800.890.7325
After Hours Emergency
800.876.6173




Click here to view our video
on how to service the
Frontline Coupling.
Video requires Quicktime Player.
Click here to download free
Quicktime Player.

Preparation of field
replacement of
pins and bushings.
Removal of pins
with ratchet wrench.
Removal of pins with
battery operated
angle ratchet wrench.
Lowering of
power ring.*

Removal of bushings
using tool and
ratchet wrench.
Removal of bushing
using tool and angle
ratchet wrench.
Loading of a
bushing in tool.
Installation of bushings
using tool and
ratchet wrench.

Installation of bushings
using tool and battery operated
angle ratchet wrench.
Raising of ring and engaging
all pins from both sides
by hand.
(Thread locker already applied)
Installation of pins
using air operated
angle ratchet wrench
Installation of pins
using ratchet wrench.

Final torquing of pins.
Final torquing of pins.
Final torquing of pins.
* In the event that there is not enough clearance between the shafts to completely remove the power ring, simply "rest it" on the shafts. There should be enough room to remove the bushings without having to move the hubs or the motor.
Frontline Industries, Inc. | 990 Chancellor Avenue | Irvington NJ 07111 | 800.890.7325 | e-mail: info@frontlineindustries.com
© 2011 Frontline Industiries Inc.