|
|
|
Preparation of field replacement of pins and bushings. |
Removal of pins with ratchet wrench. |
Removal of pins with battery operated angle ratchet wrench. |
|
|
|
Lowering of power ring. *
|
Removal of bushings using tool and ratchet wrench.
|
Removal of bushing using tool and angle ratchet wrench.
|
|
|
|
Loading of a bushing in tool.
|
Installation of bushings using tool and ratchet wrench.
|
Installation of bushings using tool and battery operated angle ratchet wrench.
|
|
|
|
Raising of ring and engaging all pins from both sides by hand. (Thread locker already applied)
|
Installation of pins using air operated angle ratchet wrench.
|
Installation of pins using ratchet wrench.
|
|
|
|
|
|
|
* In the event that there is not enough clearance between the shafts to completely remove the power ring, simply "rest it" on the shaft. There should be enough room to remove the bushings without having to move the hubs or the motor.