  1. Determine the nominal torque(Tn) in "in-lb" as follows:
                     Tn = ( H.P x 63025) / RPM
  2. Using the "Service Factor Selection Table" , select the appropriate Service Factor( Fs) for your application.
  3. Calculate the design torque (Td) as follows:
                             Td = (Tn X Fs)
  4. Using the "Coupling Rating Chart" below, in the Design Torque Column, locate the nearest higher rating and find the corresponding coupling size to the left.
  5. Compare the driver/driven shaft size to the maximum bore available in the coupling selected. If it is smaller than the driver/driven shaft sizes, then go further down the "max.bore" column to select the coupling which can accomodate these shaft sizes. Check Stock Bore sizes in the chart .

Coupling Rating Chart

Coupling Size

Design Torqu(in-lb)

Max Bore Bushing Per Hub Max. RPM Max.
Hub OD
HP@  1200 RPM HP @ 1800 RPM HP @ 3600 RPM
A 1820 1.375" 3 6000 4.500" 34 52 100
B 4435 2.000" 6 5250 5.250" 84 125 250
C 7160 2.500" 8 4500 6.000" 133 200 400
D 10518 3.000" 10 3750 6.750" 200 300 600
E 14196 3.750" 12 3600 7.500" 270 400 800
F 23660 4.000" 16 3600 9.000" 450 675 1350
G 30333 5.000" 16 3600 11.000" 575 866 1725
H 42500 6.000" 20 3600 12.000" 800 1200 2400

For available stock sizes and for specific applications, Please .

Caution! As in all rotating equipment,caution should be exercised to follow all applicable safety procedures to avoid damage to equipment or injury to personnel

 
Copyright ©2007 Frontline Industries, Inc. All Rights Reserved.